# Implementation Plan with Timeline This document outlines a proposed implementation plan with timeline for the Drinks Inventory System. ## Phase 1: Project Setup and Foundation (Week 1) ### Week 1: Setup and Basic Structure - **Days 1-2: Project Setup** - Set up database connection and configuration - Create database schema migration scripts - Configure dependency injection container - Set up Twig template engine - Create base layout template - Set up error handling and logging - **Days 3-5: Entity and Repository Classes** - Create all entity classes (DrinkType, InventoryRecord, Order, OrderItem, SystemConfig) - Create all repository classes with basic CRUD operations - Set up database schema and initial migrations - Write unit tests for entities and repositories ## Phase 2: Core Features Implementation (Weeks 2-3) ### Week 2: Drink Type and Inventory Management - **Days 1-2: Service Layer** - Implement DrinkTypeService - Implement InventoryService - Write unit tests for services - **Days 3-5: Controllers and Templates** - Implement DrinkTypeController with routes - Implement InventoryController with routes - Create templates for drink type management - Create templates for inventory management - Write feature tests for controllers ### Week 3: Order Management - **Days 1-3: Order Management Implementation** - Implement OrderService with automatic order calculation - Implement OrderController with routes - Create templates for order management - Write unit and feature tests - **Days 4-5: Dashboard Implementation** - Implement DashboardController - Create dashboard template with overview of stock levels - Implement low stock alerts - Create quick update form for inventory ## Phase 3: Advanced Features and Refinement (Weeks 4-5) ### Week 4: Adaptive Stock Level and Settings - **Days 1-3: Adaptive Stock Level Adjustment** - Implement StockAdjustmentService - Implement consumption pattern analysis - Implement automatic stock level adjustment - Write unit tests for stock adjustment - **Days 4-5: Settings Implementation** - Implement ConfigurationService - Implement SettingsController - Create settings templates - Write tests for configuration ### Week 5: UI Enhancements and Refinement - **Days 1-3: UI Enhancements** - Implement responsive design - Add color coding for stock levels - Implement mobile-friendly interface - Add form validation and error messages - Implement loading indicators - **Days 4-5: Testing and Bug Fixes** - Conduct comprehensive testing - Fix identified bugs - Optimize performance - Refine user experience ## Phase 4: Documentation and Deployment (Week 6) ### Week 6: Documentation and Deployment - **Days 1-3: Documentation** - Create user documentation - Document API endpoints - Document configuration options - Update technical documentation - **Days 4-5: Deployment** - Set up production environment - Configure database for production - Set up backup system - Configure error logging for production - Perform final testing in production environment ## Development Approach ### Iterative Development - Each feature will be developed following these steps: 1. Implement entity and repository classes 2. Implement service layer with business logic 3. Implement controller with routes 4. Create templates and UI components 5. Write tests 6. Review and refine ### Testing Strategy - Unit tests for all entity, repository, and service classes - Feature tests for controllers and UI flows - Integration tests for database operations - Manual testing for UI and user experience ### Code Quality Assurance - Follow PSR coding standards - Use static analysis tools (PHPStan, Rector) - Conduct code reviews - Maintain high test coverage ## Risk Management ### Potential Risks and Mitigation Strategies - **Scope Creep**: Strictly adhere to the defined requirements and manage change requests - **Technical Challenges**: Allocate additional time for complex features - **Integration Issues**: Implement comprehensive integration testing - **Performance Issues**: Conduct performance testing early and optimize as needed ## Conclusion This implementation plan provides a structured approach to developing the Drinks Inventory System over a 6-week period. The phased approach allows for incremental development and testing, ensuring that each component is properly implemented and integrated before moving on to the next phase.